The stormwater that runs next to the Railway Reserve and into York Terrace needs to be upgraded to increase capacity as it is currently undersized.
A larger stormwater pipe will be installed from Clarence Drive, and into York Terrace. As the road will be dug up, crews will also install new wastewater pipes into Boundary Road.
